The Advanced Camera for Surveys
  instrument > photos > hdis >
HDIS Gallery

Calibration Activities

1999.06.02 : Stability test on SIFIG
1999.04.13 : Stability troubleshooting
1999.03.23 : Test wiring following thermal vacuum
1999.02.09 : Prior to thermal vacuum test
1999.02.01 : In thermal balance fixture prior to thermal vacuum test
1998.12.18 : Stimulus for UV flat fields (STUFF), ACS in TBF
1998.12.11 : ACS / STUFF test setup
1998.12.08 : Optical test setup
1998.12.03 : Dark purge enclosure and RASCAL
1998.12.01 : Dark purge enclosure (cover) installation
1998.11.13 : ACS/STUFF UV flatfield calibration (pre thermal wiring)

Thermal Balance Fixture

1999.07.22 : Load test
1999.06.21 : Sensors

Shipment

2000.06.28 : To GSFC
1999.06.28 : To Ball
1998.11.16 : From Ball

Astronaut Training

1999.06.18 : ACS Installation (without RMS)
1999.03.17 : ACS connector panel
1999.01.08 : ACS Installation (without RMS)
1998.09.21 : ACS installation into -V2 bay
1998.09.18 : ACS Installation
1997.09.29 : Engineering development run
1997.09.25 : Engineering development run

Misc

2000.07.20 : ACS in dolly in SSDIF
1999.01.04 : Mass properties / center of gravity, Lift
1999.01.03 : Installed in ORUC A-SIPE
1998.12.23 : Installed in ORUC A-SIPE
1998.12.22 : Installed in ORUC A-SIPE, Lift, Fit-check
1998.12.17 : STAR lift prior to installation into ORUC A-SIPE for ACS fit check
1998.11.17 : ACS in dolly overview,external details
1998.04.13 : High frequency vacuum chambers for ACS CCDs

Last updated
05 February 2002 16:43:43

Maintained by


Printable version
PAVDO #: 98-011646
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLED OVER ACS; CLOSEUP OF APERTURE (WITH COVER REMOVED); NO FLASH USED DUE TO SENSITIVE OPTICS

Normal Big
PAVDO #: 98-011645
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLED OVER ACS; CLOSEUP OF APERTURE (WITH COVER REMOVED); NO FLASH USED DUE TO SENSITIVE OPTICS

Normal Big
PAVDO #: 98-011644
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLED OVER ACS

Normal Big
PAVDO #: 98-011643
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLED OVER ACS

Normal Big
PAVDO #: 98-011642
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011641
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011640
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011639
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011638
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011637
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: DARK PURGE ENCLOSURE (COVER) INSTALLATION OVER ACS

Normal Big
PAVDO #: 98-011636
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: OVERVIEW OF ACS PRIOR TO DARK PURGE ENCLOSURE INSTALLATION; OVERVIEW OF OPTICAL TEST SETUP

Normal Big
PAVDO #: 98-011635
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: OVERVIEW OF ACS PRIOR TO DARK PURGE ENCLOSURE INSTALLATION

Normal Big
PAVDO #: 98-011634
Date: 1998-12-01 HDIS #
System: AFT SHROUD SubSystem: AS, -V2 AXIAL BAY Sub-SubSystem: ACS
Description: OVERVIEW OF ACS PRIOR TO DARK PURGE ENCLOSURE INSTALLATION

Normal Big