The Advanced Camera for Surveys
  instrument > photos >
HDIS Gallery

Calibration Activities

1999.06.02 : Stability test on SIFIG
1999.04.13 : Stability troubleshooting
1999.03.23 : Test wiring following thermal vacuum
1999.02.09 : Prior to thermal vacuum test
1999.02.01 : In thermal balance fixture prior to thermal vacuum test
1998.12.18 : Stimulus for UV flat fields (STUFF), ACS in TBF
1998.12.11 : ACS / STUFF test setup
1998.12.08 : Optical test setup
1998.12.03 : Dark purge enclosure and RASCAL
1998.12.01 : Dark purge enclosure (cover) installation
1998.11.13 : ACS/STUFF UV flatfield calibration (pre thermal wiring)

Thermal Balance Fixture

1999.07.22 : Load test
1999.06.21 : Sensors

Shipment

2000.06.28 : To GSFC
1999.06.28 : To Ball
1998.11.16 : From Ball

Astronaut Training

1999.06.18 : ACS Installation (without RMS)
1999.03.17 : ACS connector panel
1999.01.08 : ACS Installation (without RMS)
1998.09.21 : ACS installation into -V2 bay
1998.09.18 : ACS Installation
1997.09.29 : Engineering development run
1997.09.25 : Engineering development run

Misc

2000.07.20 : ACS in dolly in SSDIF
1999.01.04 : Mass properties / center of gravity, Lift
1999.01.03 : Installed in ORUC A-SIPE
1998.12.23 : Installed in ORUC A-SIPE
1998.12.22 : Installed in ORUC A-SIPE, Lift, Fit-check
1998.12.17 : STAR lift prior to installation into ORUC A-SIPE for ACS fit check
1998.11.17 : ACS in dolly overview,external details
1998.04.13 : High frequency vacuum chambers for ACS CCDs

Last updated
05 February 2002 15:19:24

Maintained by
mccannwj@pha.jhu.edu


Printable version

GSFC ACS Gallery

Calibration Activities Thermal Balance Fixture Shipment Astronaut Training Misc